Thread: Big Q
View Single Post

Re: Big Q
  #7  
Old 06-02-2008, 04:14 PM
s1795so2's Avatar
s1795so2 s1795so2 is offline
GTP Level Member
iTrader: (3)
 
Join Date: Dec 2007
Location: alhambra, Il
Posts: 1,190
Thanks: 0
Thanked 0 Times in 0 Posts
Send a message via AIM to s1795so2 Send a message via MSN to s1795so2 Send a message via Yahoo to s1795so2
Default Re: Big Q

really a deck install should at the most take about 30 minutes, even for a first timer.

As far as electrical issues, there should be none, maybe slight headlight dimming but you will be alright.

if you are worried about dimming, then do the big three. which is upgrading the wire size, from alt to batt, batt to chassis ground, batt to engine block ground.
Reply With Quote